Recovered tape 04

Open the Mountain’s Mouth Before Sleeping

Recovered schematic for Open the Mountain’s Mouth Before Sleeping
Open the image to inspect the full schematic.

Machine translation — uncertain

Open the mountain's tunnel mouth before allowing the worker to sleep. Keep the entrance open throughout its rest.

GM notes · locked

Enter the GM code to open the notes.